- Home
- Departments
- Public Works
- Engineering
- 2021 Construction Projects
2021 Construction Projects
Traffic/Intersection Improvements
Pearl Street/Ivory Street/John Mahar Highway Intersection - Intersection Redesign
King Hill Road/Pond Street/Granite Street Intersection - Intersection Study
Roadway Infrastructure Program
Roadway | Section | Project Scope |
Arnold Street Aspinwall Road Braemore Road Cindy Lane Commerce Drive Donata Road Elm Knoll Road Eutaw Avenue Farm Road Forbes Road Hawthorn Road Highview Avenue Hillsdale Avenue Holmes Street Marianne Avenue Mayflower Road Middle Street Miller Street Old Liberty Road Pilgrim Road Proctor Road Richardi Lane South Street Union Street Warren Avenue | Middle St to River St Braemore to End Entire Entire Grove St to Cul-de-sac Entire Entire Entire Entire Granite St to Grandview Rd Entire Entire Entire Independence Ave to Washington St Entire Entire Liberty St to Union St Entire Entire Entire Entire Entire Roundabout to Holbrook Line Ivory St to Washington St Entire | Roadway Resurfacing Roadway Resurfacing Roadway Resurfacing Roadway and Sidewalk Reconstruction Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway Resurfacing Roadway Resurfacing Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway Resurfacing Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway and Sidewalk Reconstruction Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway Reconstruction Roadway and Sidewalk Reconstruction Roadway Resurfacing Roadway Resurfacing Roadway Resurfacing Sidewalk Reconstruction Roadway Resurfacing |
Water Projects
Replace the watermains, reclaim the roadways and place binder on the following streets.
- Glenrose Avenue (Entire)
- Argyle Road (Entire)
- Railroad Street (Entire)
- Hooker Street (Entire)
- River Street (Entire)
- Cain Avenue (Bradford St to Water St)
- Bradford Road (Wildwood Ave to Cain Ave)
- Plain Street (Garden Park to Grove St) - services only
- Hancock Street (450' between Smith St and Highland Ave) - services only
- Commercial Street (Front St to Holden Street)
- Middle Street (Cleveland Ave to Elm St)
- Quincy Avenue (Howard St to Quincy Line)
- Howard Street (Hayward St to Quincy Line)
Sewer Projects
Sewer Inflow and Infiltration Reduction Project, Years 8 and 9
Braintree performs sewer maintenance and repairs in a systematic two-year approach, the first year is an "investigation year" and includes cleaning and televising the inside of municipal sewer pipes which provides necessary system maintenance and identifies any issues that require further attention which can be addressed in the following "Rehabilitation Year". The rehabilitation work includes the lining of sewer pipes and manholes and sealing of joints and other defects with the goal of reducing the amount of groundwater infiltrating into the municipal sewer system. The majority of this work is trenchless and non-invasive, and often, residents will only see contractor vehicles parked in the middle of the street with access to the sewer system through manholes. This is a fairly expansive program that rehabilitates tens of thousands of feet of pipe in various sections of town. List of roads scheduled to be investigated and rehabilitated this year can be found at the links below.
Street Listing - Sewer Rehabilitation Year 8Street Listing - Sewer Investigation Year 9
Howard Street Pump Station
The upgrade and modernization of an aging sewer pump station, including structural repairs to the rood of the structure and replacement of pumps, channel grinders and equipment. The project also includes the installation of a flow meter. Work is expected to be completed this Spring.
Miscellaneous Projects
Elder Affairs Parking Area
Resurface the existing parking area and expand the parking lot. This project is currently in the design phase.