2022 Construction Projects

The following projects are scheduled to be completed in the 2022 Construction Season. This list is subject to change, please check the Project Updates page for project specific scheduling and status updates.

Please call the Engineering Department at (781) 794-8010 with any questions.

Traffic/Intersection Improvements 

Pearl Street/Ivory Street/John Mahar Highway Intersection - Intersection Redesign

King Hill Road/Pond Street/Granite Street Intersection - Intersection Study

Roadway Infrastructure Program 

Roadway

Section

Project Scope

Argyle Road
Adams Street
Bradford Road
Cain Avenue
Commercial Street
Donata Road
Elm Street
Federal Drive
Fern Road
Glenrose Avenue
Hawthorn Road
Hooker Street
Marianne Avenue
Middle Street
O'Toole Terrace
Railroad Street
Richardi Lane
River Street
Warren Avenue
Washington Street
Entire
Elm to Arnold
Cain to Wildwood
Entire
Elm to Front
Entire
Route 3 Overpass to Old Elm
Entire
Entire
Entire
Entire
Entire
Entire
Elm to Myrtle
Entire
Entire
Entire
Washington to Railroad
Entire
Pearl Street to Taylor Street


Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway and Sidewalk Reconstruction
Roadway Resurfacing
Roadway Resurfacing

Water Projects 

Replace the watermains, reclaim the roadways and place binder on the following streets. 

  • Quincy Avenue (Allen St to Quincy Line)

Sewer Projects

Sewer Inflow and Infiltration Reduction Project, Years 8 and 9

Braintree performs sewer maintenance and repairs in a systematic two-year approach, the first year is an "investigation year" and includes cleaning and televising the inside of municipal sewer pipes which provides necessary system maintenance and identifies any issues that require further attention which can be addressed in the following "Rehabilitation Year". The rehabilitation work includes the lining of sewer pipes and manholes and sealing of joints and other defects with the goal of reducing the amount of groundwater infiltrating into the municipal sewer system. The majority of this work is trenchless and non-invasive, and often, residents will only see contractor vehicles parked in the middle of the street with access to the sewer system through manholes. This is a fairly expansive program that rehabilitates tens of thousands of feet of pipe in various sections of town. List of roads scheduled to be investigated and rehabilitated this year can be found at the links below.

Street Listing - Sewer Rehabilitation Year 8 

Street Listing - Sewer Investigation Year 9

Howard Street Pump Station 

The upgrade and modernization of an aging sewer pump station, including structural repairs to the rood of the structure and replacement of pumps, channel grinders and equipment. The project also includes the installation of a flow meter. Work is expected to be completed this Spring.

Miscellaneous Projects 

Elder Affairs Parking Area

Resurface the existing parking area and expand the parking lot. This project is finished.