Water and Sewer Alerts

◄ Back
January 10, 2024 12:20 PM

Sanitary Sewer Overflow Advisory 1/10/24

This notification describes the ongoing sanitary sewer overflow that is occurring in the Town of Braintree. If this overflow continues for eight hours (8) another notification will be provided, otherwise, a cessation notification will be issued. See below for more information regarding the overflow.

Partially Treated or Untreated Sewer Discharge: Untreated
Location of Discharge: 44-54 Allen St. Structure C1-6
Start Time and Date of Discharge: 1/10/2024, 6:30 AM
End Time and Date of Discharge:
Duration of Discharge: Ongoing
Estimated Volume of Discharge: 500 GPM
Has Overflow Ceased: No
Names of Bodies of Water Affected by Discharge: Monatiquot River
Names of Municipalities Affected by Discharge: Braintree, Weymouth
Name of Reporting Personnel: Mark Thompson

Partially Treated or Untreated Sewer Discharge: Untreated
Location of Discharge: 44-54 Allen St. Manhole
Start Time and Date of Discharge: 1/10/2024, 6:30 AM
End Time and Date of Discharge:
Duration of Discharge: Ongoing
Estimated Volume of Discharge: 500 GPM
Has Overflow Ceased: No
Names of Bodies of Water Affected by Discharge: Monatiquot River
Names of Municipalities Affected by Discharge: Braintree, Weymouth
Name of Reporting Personnel: Mark Thompson

Partially Treated or Untreated Sewer Discharge: Untreated
Location of Discharge: 99 Shaw St.- pipe overflow
Start Time and Date of Discharge: 1/10/2024, 6:30 AM
End Time and Date of Discharge:
Duration of Discharge: Ongoing
Estimated Volume of Discharge: 500 GPM
Has Overflow Ceased: No
Names of Bodies of Water Affected by Discharge: Monatiquot River
Names of Municipalities Affected by Discharge: Braintree, Weymouth
Name of Reporting Personnel: Mark Thompson

Partially Treated or Untreated Sewer Discharge: Untreated
Location of Discharge: Arnold St. Manhole at 40 Arnold St. surcharging. 6” Pump discharged to river from Structure S1-102 to relieve surcharge.
Start Time and Date of Discharge: 1/10/2024, 6:30 AM – pumping began at 9:30 AM
End Time and Date of Discharge:
Duration of Discharge: Ongoing
Estimated Volume of Discharge: 100 GPM when manhole surcharged; 1000 GPM pumping
Has Overflow Ceased: No
Names of Bodies of Water Affected by Discharge: Monatiquot River
Names of Municipalities Affected by Discharge: Braintree, Weymouth
Name of Reporting Personnel: Mark Thompson


Partially Treated or Untreated Sewer Discharge: Untreated
Location of Discharge: Jay St.- Manhole overflow S-113
Start Time and Date of Discharge: 1/10/2024, 6:30 AM
End Time and Date of Discharge:
Duration of Discharge: Ongoing
Estimated Volume of Discharge: 100 GPM
Has Overflow Ceased: No
Names of Bodies of Water Affected by Discharge: Monatiquot River
Names of Municipalities Affected by Discharge: Braintree, Weymouth
Name of Reporting Personnel: Mark Thompson

Avoid contact with these waterbodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. The discharge or overflow consists, or likely consists, of untreated or partially treated sewage and waste. See website https://braintreema.gov/852/Municipal-Separate-Storm-Sewer-System-MS) for more information on whether specific resource areas such as bathing beaches are affected. This notice was required per 314 CMR 16.00. For more information contact:

• Brian Doran/ Mark Thompson
• Assistant Superintendent of Water
• 781-843-9205
• bdoran@braintreema.gov

Facebook Twitter Email

Latest Update:

January 12, 2024 9:52 AM

CESSATION OF SANITARY SEWER OVERFLOW NOTIFICATION

The sanitary sewer overflows described below have ceased. 

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 44-54 Allen St. Manhole (C1-5)

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 1/12/2024, 5:30 AM

Duration of Discharge: 47 hours

Estimated Volume of Discharge: 1,410,000 gal

Has Overflow Ceased: Yes

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson


Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 44-54 Allen St. Structure C1-6

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 1/12/2024, 5:30 AM

Duration of Discharge: 47 hours

Estimated Volume of Discharge: 705,000 gal

Has Overflow Ceased: Yes

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson

 

Avoid contact with these waterbodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. The discharge or overflow consists, or likely consists, of untreated or partially treated sewage and waste. See website https://braintreema.gov/852/Municipal-Separate-Storm-Sewer-System-MS) for more information on whether specific resource areas such as bathing beaches are affected. This notice was required per 314 CMR 16.00. For more information contact:

 

• Brian Doran/ Mark Thompson

• Assistant Superintendent of Water

• 781-843-9205

• bdoran@braintreema.gov


RETRACTION OF SANITARY SEWER OVERFLOW NOTIFICATION

The sanitary sewer overflow described below has ceased. 

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 99 Shaw St.- pipe overflow

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

Time and Date of Discharge Retraction: 1/12/2024, 9:30 AM

Reason for Retraction: Same discharge improperly reported twice due to confusion about location. The report concerning 44-54 Allen Street Structure C1-6. 

Name of reporting personnel: Hillary Waite 

 

 

This notice was required per 314 CMR 16.00. For more information contact:

 

• Brian Doran/ Mark Thompson

• Assistant Superintendent of Water

• 781-843-9205

• bdoran@braintreema.gov

Prior Updates

View All Updates
January 11, 2024 9:53 AM

The sanitary sewer overflow described below has ceased. 

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: Arnold St.- 6” pump discharging to river from manhole S-1 102

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 1/10/2024, 11:30 PM

Duration of Discharge: 17 hours

Estimated Volume of Discharge: 100 GPM from 6:30AM - 9:30 AM; 1000 GPM from 9:30AM - 11:30PM; estimated 858,000 gal

Has Overflow Ceased: Yes

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson

 

Avoid contact with these waterbodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. The discharge or overflow consists, or likely consists, of untreated or partially treated sewage and waste. See website https://braintreema.gov/852/Municipal-Separate-Storm-Sewer-System-MS) for more information on whether specific resource areas such as bathing beaches are affected. This notice was required per 314 CMR 16.00. For more information contact:

 

• Brian Doran/ Mark Thompson

• Assistant Superintendent of Water

• 781-843-9205

• bdoran@braintreema.gov

January 11, 2024 9:53 AM

This notification describes the ongoing sanitary sewer overflow that is occurring in the Town of Braintree. If this overflow continues for eight hours (8) another notification will be provided, otherwise, a cessation notification will be issued. See below for more information regarding the overflow.

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 44-54 Allen St. Structure C1-6 

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 

Duration of Discharge: Ongoing

Estimated Volume of Discharge: 500 GPM

Has Overflow Ceased: No

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 44-54 Allen St. Manhole

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 

Duration of Discharge: Ongoing

Estimated Volume of Discharge: 500 GPM

Has Overflow Ceased: No

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson

 

Partially Treated or Untreated Sewer Discharge: Untreated

Location of Discharge: 99 Shaw St.- pipe overflow

Start Time and Date of Discharge: 1/10/2024, 6:30 AM

End Time and Date of Discharge: 

Duration of Discharge: Ongoing

Estimated Volume of Discharge: 500 GPM

Has Overflow Ceased: No

Names of Bodies of Water Affected by Discharge: Monatiquot River

Names of Municipalities Affected by Discharge: Braintree, Weymouth

Name of Reporting Personnel: Mark Thompson

 

Avoid contact with these waterbodies for 48 hours after the discharge or overflow ceases due to increased health risks from bacteria and other pollutants. The discharge or overflow consists, or likely consists, of untreated or partially treated sewage and waste. See website https://braintreema.gov/852/Municipal-Separate-Storm-Sewer-System-MS) for more information on whether specific resource areas such as bathing beaches are affected. This notice was required per 314 CMR 16.00. For more information contact:

 

• Brian Doran/ Mark Thompson

• Assistant Superintendent of Water

• 781-843-9205

• bdoran@braintreema.gov