2025 Construction Projects

The following projects are scheduled to be completed in the 2025 Construction Season. This list is subject to change, please check the Project Updates page for project specific scheduling and status updates.

Please call the Engineering Department at (781) 794-8010 with any questions.

Traffic Signal Projects

Below is one active Traffic Signal Projects.
  • Traffic Signal Modifications are being made in South Braintree Square on Monday January 13th at the Hancock Street, Washington Street and Pearl Street intersection. The changes are described in the graphics below. 
South Braintree Square Mods

Roadway & Infrastructure Program

The following table shows the list of roads that are tentatively scheduled for rehabilitation in 2025: 
Roadway Limits Scope
Arborway Drive Entire Roadway Resurfacing and Sidewalk Reconstruction
Alida Road Entire Roadway Resurfacing
Arthur Street Entre Roadway Resurfacing and Sidewalk Reconstruction
Autumn Street Entire Roadway Resurfacing
Hollingsworth Ave Hobart Ave to Franklin St Sidewalk Reconstruction
John Mahar Highway Entire Roadway Resurfacing and Partial Sidewalk Improvements
Vinedale Road Entire Roadway Resurfacing and Sidewalk Reconstruction
Weston Avenue Entire Roadway Resurfacing and Sidewalk Reconstruction
Wood Road Entire Roadway Resurfacing

Water Projects

The following streets had their watermain replaced in 2024:
Street Limits
Arborway Drive Entire Length
Arthur Street Entire Length
Vinedale Road Arborway Drive to Pleasant View Avenue
Wood Road 165 Wood Road to Dead End
A list of streets that are tentatively planned to have their watermain replaced in 2025 will be published here in Winter/Spring of 2025.

Sewer Projects 

Sewer Inflow and Infiltration Reduction Project, Years 10, 11 and 12:

Braintree performs sewer maintenance and repairs in a systematic two-year approach, the first year is an "investigation year" and includes cleaning and televising the inside of municipal sewer pipes which provides necessary system maintenance and identifies any issues that require further attention which can be addressed in the following "Rehabilitation Year". The rehabilitation work includes the lining of sewer pipes and manholes and sealing of joints and other defects with the goal of reducing the amount of groundwater infiltrating into the municipal sewer system. The majority of this work is trenchless and non-invasive, and often, residents will only see contractor vehicles parked in the middle of the street with access to the sewer system through manholes. This is a fairly expansive program that rehabilitates tens of thousands of feet of pipe in various sections of town.

Sewer Inflow and Infiltration Reduction Project Status
  • Year 10: Construction Completed.
  • Year 11: Construction: Scheduled to start Winter 2025
  • Year 12: Investigation - Field Work Completed. 

Miscellaneous Projects

Additionally, the following projects are scheduled to be completed this year:
Project Description
2025 Tree Plantings Tree plantings in Various Locations throughout Town.